【数码】TV stand/ TV CABINET Model code:WBS047

  • 商品已下架,请重新选取其他商品
TV stand/ TV CABINET Model code:WBS047 - 电子书/杂志 - 其他材质

商品介绍

TV stand/ TV CABINET Model code:WBS047 Dimensions: inches>63"wide / 17-3/4"deep/22-1/2"high./CM >160wide/45deep/56.9high. Length : fractional> Inches >Precision : 1/4” / Decimal>Centimeter> Precision :0.1cm. paper size : Plans are designed to be printed on standard 8.5"x11" computer paper. (A4)/ Paper A0 (841mm. x 1189mm. Shipping cost : do not have Item details Digital download Digital file type(s): 3 DXF (CNC files for wood.) - PDF. - JPEG. 12 PNG. Unit of measure: Decimal CM. & fractions inches Instant Download Your files will be available to download once payment is confirmed. - Production models can be built and sold at a profit! Good luck with your work! - A detailed cutmap (cut list) has been provided. Along with some tips and tool/material suggestions. - (Here's how. I don't accept returns, exchanges, or cancellations. But please contact me if you have any problems with your order.) ** This listing is for digital download only. NO PHYSICAL ITEM will be mailed. Any props in the photos are for display purposes only. If you build this project, please share and tag me on facebook @furniture1999 We take pride in creating detailed quality woodworking plans at an affordable price. We try and focus our plans towards beginning woodworkers. We include explanations and tips and tricks that more advanced builders would also benefit from. Customers can manufacture and sell to make money from this product.

基于数码创作内容之特殊性,数码商品可不适用七天鉴赏期(犹豫期),除档案有误或存在瑕疵之外,下单即代表已知悉本商品为数码创作内容,不再享有请求退、换货之权利。如商品属于定制化商品,设计师亦可不提供取消订单或退、换货服务。下单前,请务必详阅设计馆公告或商品描述。